plenSitemap
Execution
General construction
 

Galeria Handlowa Olimp IV.

Lublin

Execution time: 11/2007 - 06/2009

Area: 63.000,0 m2

Cubature: 332.935,0 m3

Investor: Transhurt Sp. z o.o.

 
BackNext

Object of the contract.

Concrete construction with multi-level garage for 1090 automobiles, steel roof covered with thermal paper and creation of wrought aluminum forms placed throughout the entire construction, including a round window in the front facade. Construction of dividing walls, some of brick and some of drywall boards, and also drop ceilings with irregular designs. Underground passage suspended on steel cables with concrete pillar and aluminum-glass casing, connecting the new construction with the older portion of the gallery. HENPOL also performed finishing works on the ground floor.